Customization: | Available |
---|---|
Certification: | CE, ISO9001 |
Power Source: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | LY65 | LY70 | LY75 | LY85-II |
Installed Power | 96kw | 100kw | 158kw | 200kw |
Main Motor Power | 40-68kw | 50-70kw | 80-110kw | 90-140kw |
Throughput | 100-150kg/h | 100-150kg/h | 250-400kg/h | 300-500kg/h |
Dimension | 18000*1200*2200mm | 21000*1500*2200mm | 2800*1500*2200mm | 28000*2500*4500mm |
Our Services
1. Provide you the professional advice about the market, equipment, process, material, packing, etc.
2. Assist you to choose equipment, design process flow, and perfect workshop layout. If needed, we can supply service in your factory.
3. Make compensate plan to the material change according to your product, and perform the production at site.
4. Specially design and manufacture machine, practice test, and provide relevant training as customer required.
5. Provide reasonable packing and transportation plan, send technician to install and debug machine and train your workers.
6. One year guaranty time, preferentially supply spare parts.
7. Design and process similar type of spare parts of import equipment.
Compatative Advantages
1. Guaranty: One Year.
2. One set of consumable accessories will be provided with the machine.
3. Any question, you can mail/call us at any time. And our most experienced engineers are assigned to give consulting service, and always available for dispatching abroad.
4. All spare parts are always available for delivery.
5. Manual is in English.
6. Minimum order: 1 set
7. Prompt Delivery: 15-20 working days after receiving deposit
8. Installation: sending one technician to the customer's factory for installation and training.
9. Packaging: firstly packing with plastic inner side, then strengthening with wooden case outside.
MOQ | 1 set |
Supply Ability | 20 sets per Month |
Shipping port | Qingdao port, Shandong, China |
Packing details | Fumigation-free wooden case outside, stretch film inner |
Relevant spare parts | free, delivery with processing line |
Guarantee | Within 12 months |
Oversea service | Provide installation and commissioning after machine arrived your factory |
Payment terms | 30% is paid by T/T as the down payment, 70% is paid by T/T orL/C before shipment. |
Delivery time | 30 days after receipt the deposit |
Pre-shipment | When it finished, we will invite you to our company to inspect machines, when no problem, we will arrange the shipment |
FAQ:
1. How about the documents after shipment?
After shipment, we'll send all original documents to you by DHL/TNT, including Packing List, Commercial Invoice, B/L, and other certificates as required by clients.
2. How long is the delivery time?
For standard machines, it would be20-30 days; For non-standard machines and customized machines according to client's specific requirements, it would be 30-45 days.
3. Do You Arrange Shipment For The Machines?
Yes, dear esteemed customers, for FOB or CIF price, we will arrange shipment for you. For EXW price, clients need to arrange shipment by themselves or their agents.
4. How is the packing?
Water-proof plastic film package with foam protection in each corner Solid Seaworthy Wood Box Package with Steel BeltSave space as much as possible for container loading